top of page

Production Design / Art Department Team
At The End Of The Road
Various Events
by Full Circle.

Table Centres In Progress
Table centres for The Pavilion at the Tower of London summer design.

Bar and Seating Area
Installation and dressing for The Pavilion at the Tower of London summer design.

Dining Area
Installation and dressing for The Yule Ball at One London Wall.

Table Centres In Progress
Table centres for The Pavilion at the Tower of London summer design.
​TYPE |Event​
CREDIT |Design Assistants
Working for Full Circle Performance and Production during 2013, we assisted on various projects including The Pavilion at the Tower of London (summer and winter designs), The Sugar Palace and Rock The Ballroom at 8 Northumberland Avenue, Curiosity Cavern at the Billingsgate Vaults and The Yule Ball at One London Wall.
We assisted the head designer to prep furniture and make props, and install and dress the events.
bottom of page